DE EN FR
for light traffic loads
for light traffic loads
water-permeable
water-permeable
Joint width ≥ 5 mm
Joint width ≥ 5 mm
vdw 800
Art. No. 800002825 / 800003825 / 800004825

vdw 800 2K-PflasterfugenMörtel is the well-known classic among paving joint systems with a broad range of applications for paver and clinker surfacings. Suitable for jointing natural stone paving, concrete stone paving and clinker surfacings in pedestrian zones and passages, likewise for jointing patios, creating garden paths and paving garage driveways.

  • fast, economical and durable jointing
  • clean paving areas
  • self-compacting
  • resistant to sweeper-vacuum machines
  • abrasion-resistant
  • high freeze/de-icing-salt resistance
  • permanently filled joint
  • reduced risk of accidents

Application

Requirements Stable, load-bearing, permanently water-permeable substrate corresponding to the expected loads. Joint depth > 30 mm (for trafficked areas we recommend full joint depth), joint width > 5 mm, exterior and object temperature from 7 °C, max. 30 °C.

Tools Forced-action mixer or free-fall mixer, drill with mixing basket for smaller quantities, water hose with spray nozzle, mortar tub, wheelbarrow, rubber squeegee and coconut broom.

Test area With natural and concrete stone paving, contact between vdw 800 2K-PflasterfugenMörtel and the stone surface may cause visual changes. In general we strongly recommend laying out a test area.

Pre-wetting Pre-wet the area thoroughly.

Mixing the paving joint mortar Mix homogeneously pre-mixed mineral aggregates with a binder component using the contents of the binder bottle lying in the bag or bucket and twice the amount of water (as binder used before) in a forced-action mixer (5 minutes), in a free-fall mixer (8 minutes) or by means of a drill with mixing basket in the mortar tub (5 minutes).

Filling the joints Pull the mortar across the paving over the full area with a hard-rubber squeegee and work it intensively into the joints.

Sweeping off After approx. 15 to 20 minutes (at 20 °C), sweep off excess, earth-moist mortar from the surface with a damp coconut broom until it is completely removed. Do not sweep mortar residues into still-open joints. Clean the broom in water frequently.

Aftercare Cordon off and protect from moisture for a min. of 12 hours (do not lay film directly on the paving area, ensure ventilation underneath). Final traffic release of the area after 7 days.

Technical data

Joint widthFrom 5 mm
Joint depthFrom 30 mm
ColoursNatural, Stone grey, Basalt
PackagingBag 25 kg
Processing temperature7 to 30 °C
Traffic releaseAfter 7 days
Rain protectionAt least 12 hours
Water permeabilityWater-permeable

Colours & article numbers

Colour Sample Packaging Art. No.
natural natural 25 kg 800002825
stone grey stone grey 25 kg 800003825
basalt basalt 25 kg 800004825

Application

Step by step to the perfect result

Application examples

vdw 800 – Application example
vdw 800 – Application example
vdw 800 – Application example
vdw 800 – Application example

Processing

Step by step to the perfect result

Step 1
1/8 Prepare surface
Step 2
2/8 Pre-wet surface
Step 3
3/8 Add binder
Step 4
4/8 Add water
Step 5
5/8 Mix mortar
Step 6
6/8 Work in mortar
Step 7
7/8 Sweep off excess
Step 8
8/8 Finished surface
Planning tool

Consumption calculator

Calculate the material requirements for your project with this product.

We are here for you

Still have questions?
We are happy to help.

Our experts advise you free of charge and without obligation on all questions about joint mortars and paving systems.